Describe the job for the system
State whether the project concerns backup power, a scheduled operating period or another defined use. List the equipment that must remain powered and identify loads that can be disconnected. Describe the available electrical supply and whether the proposed system must operate independently during an outage. These details guide the system discussion before a cabinet size is selected.
Distinguish power and energy
Kilowatts describe power; kilowatt-hours describe energy. A constant 5 kW load running for two hours requires 10 kWh of energy at the load. That simple example excludes conversion losses, reserve, battery limits and starting behaviour. It is a starting point for a conversation, not a final battery sizing recommendation.

Request a system-level review
Provide the load profile, expected backup duration, voltage, phase arrangement and any significant starting loads. Ask the supplier or qualified project designer to review battery capacity, inverter power, usable energy, protection and the intended operating mode together. Do not assume that every storage cabinet supports the same grid, backup or off-grid functions.
Include the installation environment
State whether installation is indoors or outdoors, available space, ambient conditions, access for delivery and the intended maintenance arrangements. Applicable electrical, fire and site requirements depend on the location and installation. Use qualified local professionals to confirm the design and approvals. A product photograph or headline capacity cannot replace this review.
What to include in your enquiry
- Application and essential loads
- Load profile and required operating duration
- Supply voltage, phases and starting loads
- Installation environment and available space
- Design, approvals, commissioning and support responsibilities
Explore energy storage systems. Send your project requirements to TUORIVA.
